Inhalte

• Requirements to the auxiliary system • Basic layout, voltage levels and rating depending on power plant type and generator capacity • Redundancy concepts • DC power supply and uninterruptible power supply concepts, emergency generators • M.V.- and L.V.-switchgears in auxiliary networks including transformers, drives, adjustment drives • Selective protection in auxiliary networks • Active and reactive power control of generators, frequency control, static and dynamic stability, generator protection • Transfer concepts

Lernziele

Students have in-depth knowledge of auxiliary networks in power plants. They are able to recognise interactions with other subject areas and evaluate cross-disciplinary topics. In this context, the students recognise the interactions between selective protection in auxiliary networks, network topologies, system design and rating of the electrical equipment They are able to independently solve and evaluate application-oriented tasks and problems.

Prüfungsleistung

The exam can be in written form or as an oral exam. For a written examination: 90 minutes duration For an oral exam: 30 min duration Written and oral exams can be conducted in personal attendance or in an online format.Until the end of the first three weeks of lectures it will be announced, if the examination will be offered in written or oral form.

Literatur (1)
  • Script

Quelle: Modulbeschreibung der BTU · abgerufen 19.10.2026Original

Modulkatalog · inoffiziell

Betula ist ein inoffizielles Projekt und gehört nicht zur BTU.

Folia 1.0.3Radix 0.6.0

Daten vom 21.10.2026WiSe 2026/27Quelle: BTU